Service Head Cabinet for Electric Center

Service Head Cabinet open with filled backboard, prewired switchgear and CT Chambers.
Service Head Cabinet

Multi-occupancy building used for self-storage units and apartments.

Connecting the BNO network to a new supply, over 100 Amps, including CT metering within a Prewired Cabinet. 

Electric Center, builders merchants and their customer JR Revell Electrical Contractors, in charge of the BNO connection.

What was the issue?

More about BNO Connections

The BNO is responsible for the electricity in a multiple occupancy building, between the intake position or service head and the customer installation. 

The customer installation, usually consists of distribution board and point of  isolation.  A BNO connection must meet the requirements of the energy provider (owner of the meters) and the Distribution Network Operator (DNO) for the new energy supply.

What was the solution?

BNO Connection - Service Head Cabinet or BNO Supply Cabinet
The Prewired Split Supply Service Head Cabinet

Conclusions -

More Posts

Blog Categories
Archives
TOP

Make an enquiry

What rating are the chargers you are looking for the feeder pillar to power?
Please specify another rating.
Please specify number of chargers.
Would you prefer a Stainless Steel or a PVC feeder pillar?
If GRP is required, the PVC Feeder Pillar is electrically insulated and a suitable alternative for GRP.

Incoming DNO Specification

Please specify Supply Current in Amps.
Please specify cable area in mm2.
Please specify cable core: triple, copper, hybrid, etc.
What earthing choice would you prefer?
Which type of fault protection equipment do you require?
Do you require empty space for DNO equipment inside the feeder pillar?

Outgoing Specification

Which type of fault protection equipment do you require?
Do you require any of the following additional equipment inside the feeder pillar? Check all that apply.
Check any options that apply.
Please add any other electrical component options.
Do you require a power supply to anything outside the feeder pillar (not including the chargers) e.g. Lighting, CCTV ?

Contact Details

Please provide contact details so we can get in touch with a quote for your EV requirements.
Name
=
Following this submission, we will send you an opt-in email to confirm your consent. You can also unsubscribe at any time.

Contact Info