Ritherdon feeder pillars – Manchester Tram System

A number of Ritherdon’s stainless steel feeder pillars have now been installed along the Manchester tram system. The tram system in Manchester now carries 22 million passengers every year into the heart of the city centre, with almost 70km of track. Since 1992, the system has also more than doubled in size. Ritherdon are proud to be providing external electrical enclosures to Siemens and Manchester City Council to support the infrastructure of the famous city landmark.

Regarding the Ritherdon feeder pillars, Ian Fletcher – Contract Manager (North West) for Siemens – said:

“We use Ritherdon feeder pillars because they are of extremely good quality, well-made and in stainless steel which will give durability. They come pre-wired which reduces time on site for installation and are very competitively priced”

The Ritherdon feeder pillar is designed with an integral root & body and a detachable door. To ensure a long service life, the complete unit is manufactured from 2mm thick stainless steel and is available either in the natural stainless steel finish (pictured) or with a powder-coated finish (various colours available).

Access for cable ducting is provided through the lower front section of the pillar and duct apertures in the sides and back of the root. An earth cable is provided for bonding the door to the body, with two M6 studs complete with nuts and washers.

A number of different fixings are available for the Ritherdon feeder pillars including:

  • Tri-key cam-lock (standard)
  • Stainless steel Allen screw 25mm long
  • Stainless steel “Pin-hex” dome headed screw 25mm long
  • Pin-hex camlock (10mm A/F, 4mm pin)

For more information on our range of feeder pillars, contact us to talk about your requirements. As Ritherdon manufacture all of our feeder pillars, bespoke options to meet your specifications are available.

More Posts

Blog Categories
Archives
TOP

Make an enquiry

What rating are the chargers you are looking for the feeder pillar to power?
Please specify another rating.
Please specify number of chargers.
Would you prefer a Stainless Steel or a PVC feeder pillar?
If GRP is required, the PVC Feeder Pillar is electrically insulated and a suitable alternative for GRP.

Incoming DNO Specification

Please specify Supply Current in Amps.
Please specify cable area in mm2.
Please specify cable core: triple, copper, hybrid, etc.
What earthing choice would you prefer?
Which type of fault protection equipment do you require?
Do you require empty space for DNO equipment inside the feeder pillar?

Outgoing Specification

Which type of fault protection equipment do you require?
Do you require any of the following additional equipment inside the feeder pillar? Check all that apply.
Check any options that apply.
Please add any other electrical component options.
Do you require a power supply to anything outside the feeder pillar (not including the chargers) e.g. Lighting, CCTV ?

Contact Details

Please provide contact details so we can get in touch with a quote for your EV requirements.
Name
=
Following this submission, we will send you an opt-in email to confirm your consent. You can also unsubscribe at any time.

Contact Info