Ritherdon COVID-19 Announcement

A letter from our MD Ben Ritherdon

25th March 2020

Dear Sir or Madam

We have taken the decision to close our factory today and for the foreseeable future. We have done this to protect our staff and, also, to help with the national effort in combatting the Covid-19 outbreak.

Our administrative departments (sales, purchasing, technical and accounts) are continuing to work from home.  So, it is still possible to communicate with us in the usual ways:

If you currently have an order placed with us, we will get back in touch with you as soon as we know when the factory will reopen.  If you have an order to place and it is not needed urgently, please still send it in and, when production is about to restart, we will contact you with a delivery date.

Supporting Others at this Time

Finally, if you need one of our products (or potentially any sheet metalwork) for an emergency project, especially ones related to dealing with the current Covid-19 outbreak, please contact us.  We would be able to restart production at very short notice, if necessary.

Thank you for your support.  We are continually monitoring government guidance and we look forward to resuming manufacturing as soon as it is possible.

Yours faithfully,

Ben Ritherdon

Managing Director

More Posts

Blog Categories
Archives
TOP

Make an enquiry

What rating are the chargers you are looking for the feeder pillar to power?
Please specify another rating.
Please specify number of chargers.
Would you prefer a Stainless Steel or a PVC feeder pillar?
If GRP is required, the PVC Feeder Pillar is electrically insulated and a suitable alternative for GRP.

Incoming DNO Specification

Please specify Supply Current in Amps.
Please specify cable area in mm2.
Please specify cable core: triple, copper, hybrid, etc.
What earthing choice would you prefer?
Which type of fault protection equipment do you require?
Do you require empty space for DNO equipment inside the feeder pillar?

Outgoing Specification

Which type of fault protection equipment do you require?
Do you require any of the following additional equipment inside the feeder pillar? Check all that apply.
Check any options that apply.
Please add any other electrical component options.
Do you require a power supply to anything outside the feeder pillar (not including the chargers) e.g. Lighting, CCTV ?

Contact Details

Please provide contact details so we can get in touch with a quote for your EV requirements.
Name
=
Following this submission, we will send you an opt-in email to confirm your consent. You can also unsubscribe at any time.

Contact Info