R22 FireSeal finalist Security & Fire Excellence Awards

The R22 FireSeal enclosure (meter box) was designed and tested to prevent a fire inside a gas meter housing from spreading across and blocking an escape route from a building:  typically where gas meters have been installed in blocks of flats, by stairwells or in corridors.

The development of this new product came about when fire risk assessors highlighted that gas meters in fire escape routes were a hazard and needed to be dealt with.  We wanted to provide a solution for our customers in the social housing sector, so we designed and tested an adequate product.

The R22 FireSeal provides an easy to install solution that is fire-rated up to 90 min. The R22 FireSeal can be retrofitted, which means it can help bring an old site up to modern safety standards. For new developments, the installation of the R22 FireSeal in fire escape routes can avoid having to build separate structures saving in costly construction developments.

We are delighted to announce that we have been shortlisted for the R22 FireSeal in Passive Fire Protection category of the Security and Excellence Awards.  This is the second time we have been shortlisted for the Passive Fire Protection category, as last year, our Riser FireSeal was also a finalist.

More Posts

Blog Categories
Archives
TOP

Make an enquiry

What rating are the chargers you are looking for the feeder pillar to power?
Please specify another rating.
Please specify number of chargers.
Would you prefer a Stainless Steel or a PVC feeder pillar?
If GRP is required, the PVC Feeder Pillar is electrically insulated and a suitable alternative for GRP.

Incoming DNO Specification

Please specify Supply Current in Amps.
Please specify cable area in mm2.
Please specify cable core: triple, copper, hybrid, etc.
What earthing choice would you prefer?
Which type of fault protection equipment do you require?
Do you require empty space for DNO equipment inside the feeder pillar?

Outgoing Specification

Which type of fault protection equipment do you require?
Do you require any of the following additional equipment inside the feeder pillar? Check all that apply.
Check any options that apply.
Please add any other electrical component options.
Do you require a power supply to anything outside the feeder pillar (not including the chargers) e.g. Lighting, CCTV ?

Contact Details

Please provide contact details so we can get in touch with a quote for your EV requirements.
Name
=
Following this submission, we will send you an opt-in email to confirm your consent. You can also unsubscribe at any time.

Contact Info