R22 Gas Meter Housing

The Ritherdon R22 Replacement Gas Meter Housing is designed to replace an existing GRP Gas Meter Housing that has been damaged but where the standard GRP gas meter backplate is intact, or where there is a need to protect the unit from vandal attack. The R22G fits onto the backplate in the same manner as the original GRP Housing, by hooking the top over the backplate at the wall, and the new integrated spring bracket locks the unit in place. The extra wall fixings and the strong stainless steel case add extra protection against vandalism.

Key Features:

  • Replaces damaged meter housing by hooking onto the existing backplate.
  • Gas warning symbol embossed on the door.
  • Left-hand opening, with diecast snap-line hinges.
  • All units fitted with a slam cam and supplied with a triangular plastic key.
  • Option for a keyed cam lock.
  • Powder coated, 1.2 mm stainless steel.
  • Available in RAL 9010 Satin White.
  • Ventilation Louvres
  • No tools required for basic installation.
  • Two cable knock-outs at the bottom to allow for variable incoming cables and through fed cables.
Still don’t know whether this product is right for you?

Have your measurements ready and check out this selection guide, or ask our automated chatbot system for a recommendation by clicking the blue icon in the bottom right corner of the screen.

Product Data:

Product CodeProduct Dimensions
(h x w x d, mm)
Backplate Dimensions
(h x w, mm)
Weight
(kg)
R22G503 x 462 x 240485 x 4407

*Please note that to fit over your backplate, the backplate dimensions must be within 10mm of the backplate dimensions stated above.

R22G Documentation:

See How to Repair a Meter Box Guide with Videos.

Delivery if in Stock is 48hrs from receipt of order* for finished and painted stock, or within 5 working days, for finished stock that requires powder coating. For Natural Finish from stock, lead time is 4 working days.

For large quantity orders, non-stock items and FireSeals Made-to-Measure, the lead time is 4 working weeks.  

Any prewired feeder pillars and cabinets with electrical items have a lead time of 4 to 8 working weeks.

Current Design time for any new sizes of FireSeals or other products, please add 2 working weeks to stated lead times.

*Any proforma orders received need to be paid before the order is processed and lead times start.

We always work to despatch orders sooner if we can. 

TOP

Make an enquiry

Name
Please state product name.
Enter delivery address and/or post code.

Contact Info

Make an enquiry

What rating are the chargers you are looking for the feeder pillar to power?
Please specify another rating.
Please specify number of chargers.
Would you prefer a Stainless Steel or a PVC feeder pillar?
If GRP is required, the PVC Feeder Pillar is electrically insulated and a suitable alternative for GRP.

Incoming DNO Specification

Please specify Supply Current in Amps.
Please specify cable area in mm2.
Please specify cable core: triple, copper, hybrid, etc.
What earthing choice would you prefer?
Which type of fault protection equipment do you require?
Do you require empty space for DNO equipment inside the feeder pillar?

Outgoing Specification

Which type of fault protection equipment do you require?
Do you require any of the following additional equipment inside the feeder pillar? Check all that apply.
Check any options that apply.
Please add any other electrical component options.
Do you require a power supply to anything outside the feeder pillar (not including the chargers) e.g. Lighting, CCTV ?

Contact Details

Please provide contact details so we can get in touch with a quote for your EV requirements.
Name
=
Following this submission, we will send you an opt-in email to confirm your consent. You can also unsubscribe at any time.

Contact Info