Prewired EV Charging Feeder Pillar – 200A Three Phase | Up to 6 Ways for 22 kW EV Chargers
This 200A Three Phase EV Feeder Pillar with 6 outgoing ways for Fast Chargers (22 kW) comes ready to install. Its configurable options include an option for a preinstalled prewired CT Chamber with cable and trunking wherever CT Metering is required.
Supporting up to 6 outgoing ways for 22 kW charge points, this EV power distribution pillar offers flexibility and futureproofing at the same time. Its maximum outgoings of 6 EV Chargers can let you install the right mix of fast and slow chargers, being able to cater to different dwell times for customers as well as optimising installation costs.
Housed in your choice of Stainless Steel or PVC Plastic, this unit is engineered for durability and ease of installation. Flexibility to select the required Earthing Arrangement and Surge Protection Configuration for your installation. Optional extras like CT Chambers and cable trunking complete the setup depending on your project’s requirements.
Featured Prewired Configuration as follows:
- Charger Rating: 22 kW
- Supply: Three Phase 200A
- Outgoing Ways: Up to 6 Ways
- Cabinet Material: Stainless Steel or PVC Plastic
- Cabinet Size: 1250 / 1600 / 2100 mm (Width)
- Earth / Electrical Protection:
- Surge Protection (SPDs)
- SP and O-PEN
- Advanced Protection
- CT Metering (add where required): Preinstalled 200A CT Chamber with cable and trunking.
- Optional Accessories: Heating Kit, Cooling Kit, LED Light Kit, and more as required.
Common Applications:
The 200A EV Feeder Pillar 6 Ways is perfect for distribution power to multiple fast chargers (22kW). These are the most common “slow” fast chargers, designed for vehicles parked for several hours or even overnight. Perfect for distributing power securely to multiple chargers, primarily found at:
- Workplace Car Parks: Ideal for employees to fully recharge during the work day.
- Residential Properties: Can provide multiple charging points for daily overnight charging.
- Long stay Car Parks: Located at railway stations or airport long stays car parks where car remain for long periods.
Important Considerations:
Load Management: With 6 outgoings on a 200A supply, intelligent load management is required to ensure the 200A limit is not exceeded when multiple vehicles are charging.
Installation: Prewired in compliance with BS7671 (18th Edition Regulations) and DNO requirements.
Future Upgrades: Choice of Cabinet or Enclosure designed to allow for easy expansion.