100A Three Phase EV Feeder Pillar Up to 3 Ways 22kW

Ready to install EV Feeder Pillar 3 Ways for incoming 100Amp Three phase supply. Supporting up to 3 outgoing ways for 22 kW charge points, it offers a futureproof setup with efficient power distribution.

Perfect for solution for powering Fast Chargers for locations where long dwell time is preferred.

Image used for illustrative purposes. Product photo not exact as various configurations are available.

Prewired EV Charging Feeder Pillar – 100A Three Phase | Up to 3 Ways for 22 kW EV Chargers

Ready to install for three phase charging installations, ideal for fast chargers at residential developments, workplaces and light commercial sites. Supporting up to 3 outgoing ways for 22 kW charge points, it offers a futureproof setup with efficient power distribution.

Choose from Stainless Steel or PVC Cabinets in three sizes, with the flexibility to select the required Earthing Arrangement and Surge Protection Configuration for your installation.

Featured Prewired Configuration as follows:

  • Charger Rating: 22 kW
  • Supply: Three Phase 100A
  • Outgoing Ways: up to 3 Ways
  • Cabinet Material: Stainless Steel or PVC Plastic
  • Cabinet Size: 1250 / 1600 / 2100 mm (Width)
  • Earth / Electrical Protection:
    • Surge Protection (SPDs)
    • SP and O-PEN
    • Advanced Protection
  • Optional Accessories: Heating Kit, Cooling Kit, LED Light Kit, and more as required.

Common Applications:

The 100A EV Feeder Pillar 3 Way is perfect for distributing power to multiple fast chargers (22 kW).

These are the most common “slow” fast chargers, designed for vehicles parked for several hours or even overnight. Perfect for distributing power securely to multiple chargers, primarily found at:

  • Workplace Car Parks: Ideal for employees to fully recharge during an 8 hour work day.
  • Residential Properties: Can provide multiple charging points for daily overnight charging.
  • Long stay Car Parks: Located at railway stations or airport long stays car parks where car remain for long periods.

Important Considerations:

Load Management: With 3 outgoings on a 100A supply, intelligent load management is required to ensure the 100A limit is not exceeded when multiple vehicles are charging.

Installation: Prewired in compliance with BS7671 (18th Edition Regulations) and DNO requirements.

Future Upgrades: Choice of Cabinet or Enclosure designed to allow for easy expansion.

Lead time is 4 to 8 working weeks.

*Any proforma orders received need to be paid before the order is processed and lead times start.

We always work to despatch orders sooner if we can.

TOP

Make an enquiry

Name
Please state product name.
Enter delivery address and/or post code.

Contact Info

Make an enquiry

What rating are the chargers you are looking for the feeder pillar to power?
Please specify another rating.
Please specify number of chargers.
Would you prefer a Stainless Steel or a PVC feeder pillar?
If GRP is required, the PVC Feeder Pillar is electrically insulated and a suitable alternative for GRP.

Incoming DNO Specification

Please specify Supply Current in Amps.
Please specify cable area in mm2.
Please specify cable core: triple, copper, hybrid, etc.
What earthing choice would you prefer?
Which type of fault protection equipment do you require?
Do you require empty space for DNO equipment inside the feeder pillar?

Outgoing Specification

Which type of fault protection equipment do you require?
Do you require any of the following additional equipment inside the feeder pillar? Check all that apply.
Check any options that apply.
Please add any other electrical component options.
Do you require a power supply to anything outside the feeder pillar (not including the chargers) e.g. Lighting, CCTV ?

Contact Details

Please provide contact details so we can get in touch with a quote for your EV requirements.
Name
=
Following this submission, we will send you an opt-in email to confirm your consent. You can also unsubscribe at any time.

Contact Info