Pitch Perfect: Durable Weatherproof Enclosures for Burnley FC’s Training Ground

Introduction: Powering a Premier Playing Surface

Oldfield Electrical and their partners Read Electrical turned to Ritherdon for durable, weatherproof enclosures to house the essential power and metering systems supporting Burnley FC’s training pitch at Gawthorpe.

Football is a game of precision—and so is pitch maintenance. A professional playing surface isn’t just about the right grass, but also the right infrastructure to keep it in top condition year round.

For this project, they selected:

  • Two RMC2100 Cabinets – Providing a robust, stainless steel solution for housing electrical distribution and metering equipment.
  • Two RB1550 Cabinets with an extra large access panel – For easy maintenance access.

The Challenge: Powering Gawthorpe’s Pitch Maintenance Systems

Maintaining a professional football pitch is more than just cutting the grass. It requires specialist grow lighting to promote healthy grass growth, especially during low-light months.

This requires: Reliable power distribution and metering to manage energy use efficiently.

These systems need to operate flawlessly in all weather conditions, from cold Lancashire winters to wet matchdays. The Gawthorpe Training Ground needed a strong, safe, and easy-to-access enclosures for its important electrical systems.

The Solution: Ritherdon RMC & RB Cabinets

With decades of experience in manufacturing tough, weather-resistant enclosures, Ritherdon was the natural choice.

RMC2100 Cabinets for Secure Power & Metering

The RMC2100 Cabinets were chosen for their:

  • Stainless steel construction, ensuring longevity in outdoor environments.
  • Ample internal space, perfect for housing power distribution and metering equipment.
  • Lockable, secure doors, protecting sensitive electrical components from tampering.

RB1550 Cabinets for Easy Access

To complement the RMC Cabinets, two RB1550 Cabinets  were also needed. They included an Access Panel as an Optional Accessory, offering these advantages:

  • Quick and efficient maintenance, reducing downtime for electrical servicing.
  • A compact yet robust solution, ideal for housing additional pitch infrastructure.

The access panel required a larger size than our usual, and naturally, we were pleased to accommodate.

HIAB Delivery for Hassle-Free Installation

To simplify installation at Gawthorpe, Ritherdon arranged HIAB (crane) delivery. This delivery method made it easer to move and position these large Cabinets. Safely lifting and positioning the RMCs exactly where they needed helped Oldfield Electrical and Read Electrical completed the job smoothly, efficiently and most importantly safely. 

The Result: A Power Solution Ready for Kick-Off

With Ritherdon’s enclosures, Burnley FC Training Ground now benefits from:

  • Reliable, all weather power distribution, keeping the pitch maintenance systems running smoothly.
  • Secure, low maintenance enclosures, reducing the risk of electrical failures.
  • Optimised accessibility, making servicing and metering checks faster and easier.
  • A future proof solution, built to last for years to come.

Thanks to Oldfield Electrical’s and Read Electrical’s installation and Ritherdon’s enclosures, Gawthorpe’s pitch will remain in top condition — ensuring players, fans, and groundskeepers all get the best possible experience.

More Posts

Blog Categories
Archives
TOP

Make an enquiry

Get in touch to make an enquiry about any of our products.

What rating are the chargers you are looking for the feeder pillar to power?
Please specify another rating.
Please specify number of chargers.
Would you prefer a Stainless Steel or a PVC feeder pillar?
If GRP is required, the PVC Feeder Pillar is electrically insulated and a suitable alternative for GRP.

Incoming DNO Specification

Please specify Supply Current in Amps.
Please specify cable area in mm2.
Please specify cable core: triple, copper, hybrid, etc.
What earthing choice would you prefer?
Which type of fault protection equipment do you require?
Do you require empty space for DNO equipment inside the feeder pillar?

Outgoing Specification

Which type of fault protection equipment do you require?
Do you require any of the following additional equipment inside the feeder pillar? Check all that apply.
Check any options that apply.
Please add any other electrical component options.
Do you require a power supply to anything outside the feeder pillar (not including the chargers) e.g. Lighting, CCTV ?

Contact Details

Please provide contact details so we can get in touch with a quote for your EV requirements.
Name
=
Following this submission, we will send you an opt-in email to confirm your consent. You can also unsubscribe at any time.

Contact Info