Pre-Christmas Order Dates 2018

Thanks again for your continued support throughout the year. It’s been a very busy year for Ritherdon as our cabinets have been in high demand. We would appreciate if you could order as soon as possible and be guided by the cut-off dates below so that we can make sure you receive your orders before Christmas.

Lead time

Please Order 

Before End of Play

Products*

Out of Stock items on a 4-week lead time.

19th November

Made to order products such as FireSeals, or custom RB Cabinets with accessories.
Stock items to be painted  5-7  working day lead time.

12th December

RB cabinets and R/RH Pillars that must be powder coated to customer chosen colour.
Finished stock items on a 48-hour lead time.

19th December

Door and Frame Meter box repairs units and Meter Boxes.

*The products listed are examples only and the list is not exhaustive. Stock moves quickly and lead time will depend on the stock at the time of ordering.

We would also like to advise that the factory closes for the Christmas break from the 21st of December up to January 1st January.

Please give us a call on 01254819100 and we will be happy to help with your end of 2018 orders or advise further for any projects in the pipeline for 2019.

More Posts

Blog Categories
Archives
TOP

Make an enquiry

Get in touch to make an enquiry about any of our products.

What rating are the chargers you are looking for the feeder pillar to power?
Please specify another rating.
Please specify number of chargers.
Would you prefer a Stainless Steel or a PVC feeder pillar?
If GRP is required, the PVC Feeder Pillar is electrically insulated and a suitable alternative for GRP.

Incoming DNO Specification

Please specify Supply Current in Amps.
Please specify cable area in mm2.
Please specify cable core: triple, copper, hybrid, etc.
What earthing choice would you prefer?
Which type of fault protection equipment do you require?
Do you require empty space for DNO equipment inside the feeder pillar?

Outgoing Specification

Which type of fault protection equipment do you require?
Do you require any of the following additional equipment inside the feeder pillar? Check all that apply.
Check any options that apply.
Please add any other electrical component options.
Do you require a power supply to anything outside the feeder pillar (not including the chargers) e.g. Lighting, CCTV ?

Contact Details

Please provide contact details so we can get in touch with a quote for your EV requirements.
Name
=
Following this submission, we will send you an opt-in email to confirm your consent. You can also unsubscribe at any time.

Contact Info