Lifting Rails: Designed to Be Removed

Our larger RMC Cabinets and Power Supply Enclosures are fitted with removable lifting rails to make handling and installation safer and easier. Once the cabinet is installed, these rails should be removed and stored inside the cabinet for future use.

The rails are fitted to our RMC1250, RMC1600 and RMC2100 Cabinets, as well as our PS300 and TBS300 Power Supply Enclosures.

They are designed to be used during lifting and positioning of the cabinet and then removed once installation is complete.

Why remove them?

We have noticed that the lifting rails are often left in place after installation, usually in the upright lifting position.

And, admittedly, they do not exactly add to the smart appearance of a Ritherdon cabinet. We take pride in the finished look of our enclosures, so we would much rather see them removed once they have done their job.

But this is not just about aesthetics.

The lifting rails are made from mild steel, while the cabinets themselves are manufactured from stainless steel. Leaving the mild steel rails exposed to the elements means they can corrode over time.

That is why we are now making the lifting rails red. The colour provides a visual reminder that the rails are intended to be removed after installation.

When a lifting rail has another purpose

There can be practical reasons why an installer might want to keep a lifting rail in place.

In one installation, a Ritherdon feeder pillar used to house a Battery Energy Storage System (BESS) was adapted with an internal rack to accommodate the equipment.

The installer also used one of the lifting rails as a mounting bracket for an antenna.

It is a good example of how the requirements of a particular application can influence the way an enclosure is used.

However, leaving a mild steel lifting rail in place for this purpose can lead to localised corrosion over time.

To address this, we plan to offer a stainless steel antenna bracket as an alternative, allowing installers to mount an antenna without needing to leave the lifting rail in position.

Read more: Safe Lifting in PVC Cabinets. 

Keep them for future use

Removing the rails does not mean throwing them away.

We recommend storing them safely inside the cabinet once installation is complete.

If the cabinet ever needs to be relocated, removed or handled again, the lifting rails can be refitted to facilitate safe lifting.

It is a small step, but an important one.

Cabinet installed? Remove the rails. Store them inside the cabinet. Job done. 

More Posts

Blog Categories
Archives
TOP

Make an enquiry

Get in touch to make an enquiry about any of our products.

What rating are the chargers you are looking for the feeder pillar to power?
Please specify another rating.
Please specify number of chargers.
Would you prefer a Stainless Steel or a PVC feeder pillar?
If GRP is required, the PVC Feeder Pillar is electrically insulated and a suitable alternative for GRP.

Incoming DNO Specification

Please specify Supply Current in Amps.
Please specify cable area in mm2.
Please specify cable core: triple, copper, hybrid, etc.
What earthing choice would you prefer?
Which type of fault protection equipment do you require?
Do you require empty space for DNO equipment inside the feeder pillar?

Outgoing Specification

Which type of fault protection equipment do you require?
Do you require any of the following additional equipment inside the feeder pillar? Check all that apply.
Check any options that apply.
Please add any other electrical component options.
Do you require a power supply to anything outside the feeder pillar (not including the chargers) e.g. Lighting, CCTV ?

Contact Details

Please provide contact details so we can get in touch with a quote for your EV requirements.
Name
=
Following this submission, we will send you an opt-in email to confirm your consent. You can also unsubscribe at any time.

Contact Info