Power Supply Enclosures

External Electrical Enclosures - RB range

Customer Installations

Focus on customer installations: We’re featuring three installs, an RMC cabinet, R pillar, and PS60 cabinet. Read more in our blog.

Read More »
Stainless Steel enclosure 1250 wide
Electrical Enclosures

RMC Cabinets Available in 3 Sizes

We take pride in listening to our customers requirements, so we took a closer look at our RMC cabinets and came up with three different sizes. This allows Ritherdon to provide wider and more spacious cabinets from a standard range, without having to custom-make a cabinet from scratch everytime! Ritherdon is a designer and manufacturer

Read More »
PS300 Permanent Supply Kiosk in Dark Grey Finished Installation
External Electrical Enclosures - RB range

Have you found the right Power Supply Enclosure?

Our outdoor electrical enclosures are often called for when installing a new power supply connection. We have an extensive range of pillars and cabinets, all suitable for an electrical connection.  You’ll find them all under electrical enclosures, starting with the smaller cost-effective R Pillars. These are root mounted feeder pillars with lift-off doors from the R

Read More »
Customer Installation RB Cabinet RB800 1400 H 300D
Case Studies

Showcase of Customer Installations

We’ve rounded up products photos that our customers have kindly shared with us. What better way to see our products than after they have been installed and in use by our customers? Single Door RB Cabinet Side by Side in Dark Green We especially like the before and after photos from this upgrade. The older

Read More »
CT Chamber UKPN specification
Case Studies

Working with UK Power Networks to develop the CT Chamber

Ritherdon has been making CT metering panels* for the South East for over thirty years, originally for the Eastern and South Eastern Electricity Boards.  The Ritherdon “CT Chamber” was originally designed for UK Power Networks (UKPN) the current Distribution Network Operator (DNO) for the South East. About this time the team at UKPN needed a

Read More »
Siemens UKPN preferred supplier of CT Chamber
Case Studies

Siemens UK

As one of our customers, Siemens are visiting the factory today. They have been looking at how we make the CT Chamber that they use and how we can work together to find new solutions to their needs. We are flexible in our offering as we can design and develop in our factory right here in Darwen. Ritherdon have experience in

Read More »
Article Categories
TOP

Search ritherdon.co.uk

SHOPPING BAG (0)