A Lockdown Update From Ritherdon

As you are aware, we closed the factory, the past 25th of March. We did so to protect our staff, help in the national effort to combat Covid-19, and protect front line workers. Quite a few of us are in furlough and those who can, have been working from home. We are lucky to be in a position where everyone is on full pay and there haven’t been any redundancies. During this time Ritherdon has been:

Supporting customers. 

We sent out products, from stock, for critical projects during lockdown. That related to dealing with the Covid-19 outbreak.

Working from home.

Providing support for queries, technical questions and helping you plan for future work. Ritherdon has always supported flexible working practices. We all use flexitime and office staff worked from home when needed. When office-based staff started remote working, some of us had already had a bit of practice. 

Keeping Connected.

Whilst staying home we have kept in touch with all staff using private group messaging. Its has been a welcome bit of fun for the whole team. We’ve also connected with other manufacturers to share best practices and support.

Preparing to come back.

Production will restart in the factory on Monday the 18th of May. Following guidelines, with strict hygiene standards and social distancing to keep everyone safe. 

We will be contacting our customers, who have orders with us, over the next couple of weeks. While production capacity increases and we re-established the production plan. 

We thank you for your support and your continued business. We look forward to a progressive, full return to the best of our ability, taking all the necessary steps to ensure everyone’s safety.

Best Regards from the Ritherdon Team 

More Posts

Blog Categories
Archives
TOP

Make an enquiry

What rating are the chargers you are looking for the feeder pillar to power?
Please specify another rating.
Please specify number of chargers.
Would you prefer a Stainless Steel or a PVC feeder pillar?
If GRP is required, the PVC Feeder Pillar is electrically insulated and a suitable alternative for GRP.

Incoming DNO Specification

Please specify Supply Current in Amps.
Please specify cable area in mm2.
Please specify cable core: triple, copper, hybrid, etc.
What earthing choice would you prefer?
Which type of fault protection equipment do you require?
Do you require empty space for DNO equipment inside the feeder pillar?

Outgoing Specification

Which type of fault protection equipment do you require?
Do you require any of the following additional equipment inside the feeder pillar? Check all that apply.
Check any options that apply.
Please add any other electrical component options.
Do you require a power supply to anything outside the feeder pillar (not including the chargers) e.g. Lighting, CCTV ?

Contact Details

Please provide contact details so we can get in touch with a quote for your EV requirements.
Name
=
Following this submission, we will send you an opt-in email to confirm your consent. You can also unsubscribe at any time.

Contact Info